Please use this identifier to cite or link to this item: http://dspace.lib.uom.gr/handle/2159/23387
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorΣουμπενιώτης, Δημήτριοςel
dc.contributor.authorΘεοδωρακόπουλος, Ιωάννης Παναγιώτηςel
dc.contributor.authorTheodorakopoulos, Ioannis Panagiotisen
dc.date.accessioned2019-10-14T10:05:55Z-
dc.date.available2019-10-14T10:05:55Z-
dc.date.issued2019el
dc.identifier.urihttp://dspace.lib.uom.gr/handle/2159/23387-
dc.descriptionΔιπλωματική εργασία--Πανεπιστήμιο Μακεδονίας, Θεσσαλονίκη, 2019el
dc.descriptionΤο ηλεκτρονικό αντίτυπο της διπλωματικής θα αποδεσμευτεί μετά τις 17/03/2022el
dc.description.abstractThe mining operation of PE 2309 provides for a total investment of 12,866,788 euros during the first three years of activity. Such an investment ranks the MB GOLD SARLU in the special exchange, tax, customs and legal regime applicable to major investments in the mining sector (Law No. 2001-031 of 08 October 2002 establishing a special regime for major investments in the Malagasy mining sector (LGIM) as amended by Law No. 2005-022). The prospecting and mining research carried out in the period 2008 - 2012, updated during the 2017, identified an important placer gold placer. Mining will be conducted in parallel slices dimension: 50 X 80 m. The discovery will be executed: - By the first layer of 3 - 5 m: by Dozer with lateral thrust, - Below three meters to the roof of the deposit with crawler excavator and transportation stock, positioned next to the push of the dozer, with dump truck. The waste rock, moved laterally to the operating slab, will be pushed by dozer to fill the hole of the slice exploited to carry out the environmental recovery of the site. The extraction of the ore is carried out using high-pressure water monitors that provide the slaughter of the front of the slice in operation. The ore will be sent for gold recovery to the Wash Plant through a gravel pump. The productive capacity of the Wash Plant installed in the first year is of 150 t / h, in the third year will be raised to 350 t / h with the installation of a second construction site.en
dc.format.extent44el
dc.language.isoenen
dc.publisherΠανεπιστήμιο Μακεδονίαςel
dc.rightsΑναφορά Δημιουργού 4.0 Διεθνές*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/*
dc.subjectSarluen
dc.subjectMbgolden
dc.titleBusiness plan MB Gold Mining Company in Madagascaren
dc.typeElectronic Thesis or Dissertationen
dc.typeTexten
dc.contributor.departmentΔιατμηματικό Πρόγραμμα Μεταπτυχιακών Σπουδών στη Διοίκηση Επιχειρήσεωνel
Appears in Collections:ΔΠΜΣ Διοίκηση Επιχειρήσεων (M)

Files in This Item:
File Description SizeFormat 
TheodorakopoulosIoannisPanagiotisMsc2019.pdf2.99 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons